Melbourne City Link Project

  • Project management and construction of the noise attenuation fencing along the Southern Link of the Melbourne City Link and installation of construction materials including timber panel, concrete panel and transparent panel with steel posts and extensive concrete footings.
  • Industrial landscaping including extensive footways and retaining walls requiring foundation works including battering and earthmoving.
  • Construction and repair of car park surface at Olympic Park.
  • Construction of access driveways and footways for all tech shelters on the Western & Southern Links.

Enetech Engineers & Contractors

  • Extensive relocation of Telstra cables and installation of sheet piles for ground support. Construction of concrete manholes and retaining walls in Dudley / Flinders Streets Melbourne, Victoria.
  • Relocation of Telstra cables and construction of concrete manholes in Sunshine, Victoria.
  • Relocation of Telstra cables and construction of concrete manholes in Bacchus Marsh, Victoria.

John Holland Pty Ltd

  • Excavation, drainage and formwork construction of concrete holding tanks for Kyneton Sewerage Treatment Plant

Walters Construction Group

  • Aqua 2000 Water Treatment Plant detailed excavation, formwork, underground & above-ground pipe work.

Thompson Bros. Pty Ltd

  • Subdivision – storm water drainage, sewer reticulation and road works. /li>

Barwon Health

  • Grace McKellar Redevelopment, Geelong – car park, and drainage.

Carey Contracting Services

  • Winchelsea Hospital – Carpark, drainage and roadworks

William Loud (Aust) Pty Ltd

  • Goldsworthy Reserve – drainage and concrete pavement

John Holland Pty Ltd Tunelling

  • Client:  Melbourne Water
  • Palmer Street stormwater upgrade – pipe jacking, pit construction, supply of all plant and labour for drainage works.

John Holland Pty Ltd

  • Werribee Waste Water Treatment Plant – Drainage and Roadworks

John Holland Pty Ltd Tunelling

  • Installation of 750 mm diameter steel pipe for wastewater line between Melbourne Water Treatment Plant and Werribee South.

Thiess-Astrom Joint Venture

  • Regional Fast Rail Project-Deer Park to Ballarat- Road Works – Drainage, Reticulation Works

John Holland Pty Ltd

  • Regional Fast Rail Project, Bendigo – Track widening and associated Road Works

Thiess Alstrom  Joint Venture

  • North Shore Rail Upgrade

Thiess Pty Ltd

  • Craigieburn Rail-Electricification

Thiess John Holland

  • Eastlink

FRH Group (Current Works)

  • Calder Freeway-Malmsbury to Ravenswood Section

Thiess Pty Ltd (Current Works)

  • Calder Freeway Upgrade-Stage 3 Harcourt

Thiess Alstrom Pty Ltd

  • Spencer Street Rail Motorised Rail

ABI-Group

  • St. Albans Under Pass

Westgate Freeway Alliance (Current Works)

  • Monash Section
  • Westgate Section

Fulton Hogan

  • Moorabool Bridges

ABI-Group (Current Works)

  • Stage 3 Highway - Geelong

Fulton Hogan (Current Works)

  • Stage 4 Highway - Geelong

Fulton Hogan (Current Works)

  • Northern Expressway - South Australia

STaPS Alliance (Current Works)

  • Werribee and Brooklyn - various works